Almost every guide to septic system regulations tells you to "get a permit" and then stops. The hard part is knowing which office — and the answer is not the one most people assume. In only 13 of the 51 US jurisdictions does a state agency issue a homeowner's septic permit directly. This page lists the permitting authority for all 51, each with a link to the government page it came from.

Who issues a residential septic permit, across all 51 jurisdictions:

A county, city, district or town office21
It varies within the state — some areas delegated, some not16
A state agency, directly13
No residential septic programme (District of Columbia — on public sewer)1

So in 38 of 51, applying to the state environmental or health department is either wrong or only sometimes right. The state agency usually writes the rules; a local office issues the permit and sets the fee.

Septic permit authority, state by state

Sorted alphabetically. The agency in the last column is the state-level programme — it is who to ask if you cannot work out which local office covers your parcel, and its page is where each row came from.

StateWho issues your septic permitLevelState programme & source
Alabama Your county health department Local Alabama Department of Public Health, Division of Community Environmental Protection
ADPH writes the rules; the county health department issues the permit and may set its own fee.
Alaska Alaska DEC directly (regional offices) for most of the state; the Municipality of Anchorage and City of Valdez have their own additional local requirements source unreachable It varies Alaska Department of Environmental Conservation
DEC issues most permits statewide itself; Anchorage and Valdez are carve-outs with their own local process — check locally there.
Arizona County environmental/health department — all 15 AZ counties are delegated by ADEQ to issue permits on its behalf source unreachable Local Arizona Department of Environmental Quality
ADEQ sets the statewide rule but never issues the permit itself — apply to your county, which issues on ADEQ's behalf.
Arkansas Arkansas Department of Health, via its county-based Local Health Unit Onsite Environmental Specialist source unreachable State Arkansas Department of Health
Two permits needed (construction + operation); apply through the county health unit, but it's a state ADH program, not county government.
California Your county or city environmental health department — a Regional Water Board only where no local programme exists It varies California State Water Resources Control Board
Local agencies permit under an approved Local Agency Management Program; the state steps in only where there isn't one.
Colorado County or local public health agency Local Colorado Department of Public Health and Environment (Water Quality Control Division/Commission)
State Reg 43 sets only the floor; every county/local health agency issues its own permits and may require stricter rules.
Connecticut Local director of health (town or district health department) Local Connecticut Department of Public Health
For ordinary residential flow, the local director of health issues the permit, not the state — DPH steps in only for larger systems.
Delaware DNREC Division of Water (state, direct — no county permitting layer) State Delaware Department of Natural Resources and Environmental Control
Delaware is a true state-direct system: DNREC itself issues the site evaluation and construction permit, no county involved.
District of Columbia No residential septic permitting programme — the District is served by public sewer N/A District of Columbia Department of Energy and Environment (DOEE)
DC is almost entirely on public sewer. DOEE's own licences-and-permits page lists wells, wetlands, storage tanks and lead — no septic permit of any kind. We found no residential onsite-wastewater programme; if you have a system here, ask DOEE directly.
Florida Florida DEP directly in 16 Panhandle counties and Marion; your county health department elsewhere It varies Florida Department of Environmental Protection
The programme moved from the Health Department to DEP in 2021 and the transfer is still rolling out, so confirm who holds your county.
Georgia County (or multi-county district) Environmental Health Office Local Georgia Department of Public Health (DPH), Environmental Health Section
DPH writes the statewide rule; your County (or district) Environmental Health Office issues the permit and certifies installers.
Hawaii State Dept. of Health, Wastewater Branch (plans filed by a licensed engineer) State Hawaii Department of Health, Wastewater Branch
Hawaii has no county health depts — a licensed engineer files Individual Wastewater System plans directly with the State Wastewater Branch.
Idaho One of Idaho's 7 multi-county Public Health Districts Local Idaho Department of Environmental Quality (DEQ)
DEQ writes the statewide rule but delegates permitting, site evaluation, and inspection to Idaho's 7 multi-county public health districts.
Illinois IDPH directly in most counties; ~90 local health depts as IDPH's agent or under local ordinance elsewhere It varies Illinois Department of Public Health (IDPH)
IDPH itself permits many counties directly; ~90 local health depts handle it elsewhere as IDPH's agent — confirm which applies to your county.
Indiana Local (county/district) health department, via its health officer Local Indiana Department of Health (IDOH), Environmental Public Health Division
IDOH writes 410 IAC 6-8.3 statewide, but local health depts issue the ~15,000 permits/year and each sets its own installer rules.
Iowa Local (county) board of health / environmental health department Local Iowa Department of Natural Resources (DNR)
Local boards of health have primary responsibility for typical residential systems under DNR's minimum standards; DNR backstops if a county won't enforce them.
Kansas County health/zoning/code office under its own adopted local code; KDHE directly where none exists It varies Kansas Department of Health and Environment (KDHE)
103 of 105 counties adopted their own onsite-wastewater code meeting KDHE's Bulletin 4-2; the rest fall under KDHE's own K.A.R. 28-5 rules directly.
Kentucky Local health department (certified onsite sewage disposal inspector) Local Kentucky Cabinet for Health and Family Services, Department for Public Health, Environmental Management Branch
You apply through your local health department, not the state directly; site evaluation + certified installer required unless you qualify for a homeowner permit.
Louisiana Parish Health Unit sanitarian (a Louisiana Dept. of Health field office in each parish) State Louisiana Department of Health (LDH), Bureau of Sanitarian Services, Onsite Wastewater Program
Parish Health Units are LDH's own regional offices (state program), not independent parish government; 57 of 64 parishes also layer their own local sewage ordinances on top.
Maine Local Plumbing Inspector (LPI), appointed by the municipality (or by the state in unorganized territory) Local Maine Department of Health and Human Services (DHHS), Maine CDC, Subsurface Wastewater Unit
Permits come from your town's Local Plumbing Inspector, not a county office; DEP only takes over for large or variance systems. Page shows revision 12/3/2024.
Maryland County Health Department / Local Approving Authority, under delegated state authority Local Maryland Department of the Environment (MDE), Wastewater Permits Program, On-Site Systems Division
MDE delegates permitting to county health departments statewide; MDE itself only co-reviews systems of 5,000 gpd or more.
Massachusetts Your municipal Board of Health — not the county source unreachable Local Massachusetts Department of Environmental Protection
Massachusetts permits at town level, not county: roughly 351 Boards of Health each issue the construction permit.
Michigan Local (county or district) health department, under its own local sanitary code Local Michigan Department of Environment, Great Lakes, and Energy (EGLE), Onsite Wastewater Management Unit
Michigan is the notable outlier: there is no statewide septic code — each local health department writes and enforces its own sanitary code and permit process.
Minnesota Local unit of government — county, city, or township — under state technical rules Local Minnesota Pollution Control Agency (MPCA)
MPCA itself only permits large systems over 10,000 gpd; ordinary residential permits are issued locally, and every county must have an SSTS ordinance.
Mississippi County Health Department (a Mississippi State Dept. of Health field office) / MSDH regional environmentalist State Mississippi State Department of Health (MSDH), Division of On-Site Wastewater
Mississippi's county health departments are MSDH's own field offices, not independent county agencies — it is one statewide program. Page last reviewed 5/18/2021.
Missouri Varies by county: the local health department (or other local agency under state contract or a county ordinance) in most counties, or the DHSS Onsite Program directly where no local authority exists It varies Missouri Department of Health and Senior Services (DHSS)
Authority is per-county (DHSS direct, contracted, or county ordinance) — confirm your county's jurisdiction before applying; DNR handles non-single-family lagoons.
Montana County sanitarian / environmental health office (delegated under 50-2-116, MCA) issues the individual system permit in most counties; Montana DEQ separately reviews and approves subdivision sanitation (Certificate of Subdivision Approval) before parcels under 20 acres can be created It varies Montana Department of Environmental Quality (DEQ)
DEQ's role is subdivision-level sanitation review (<20-acre parcels); the actual construction permit for an individual system comes from your county sanitarian, not DEQ.
Nebraska Nebraska Department of Environment and Energy (DEE) — but most residential systems need no state construction permit at all if they qualify for "Authorization by Rule"; a permit is required only for flows ≥1,000 gpd or sites that don't meet Authorization-by-Rule criteria State Nebraska Department of Water, Energy, and Environment (DWEE)
Most homes qualify for Authorization by Rule (no state construction permit needed); local zoning/building requirements may still apply separately.
Nevada Local health authority — Southern Nevada Health District (Clark Co.), Northern Nevada Public Health (Washoe Co.), Central Nevada Health District (Churchill/Eureka/Mineral/Pershing) — or a county building department; NDEP's Bureau of Water Pollution Control directly in areas with no delegated local health authority It varies Nevada Division of Environmental Protection (NDEP)
Residential ISDS permits come from your county health district (or building dept where none exists), not from NDEP directly, for most homes.
New Hampshire New Hampshire Department of Environmental Services (NHDES), Subsurface Systems Bureau — statewide, no county or municipal permitting layer State New Hampshire Department of Environmental Services (NHDES)
NHDES itself issues both the Approval for Construction and the Approval for Operation — apply to the state, not your town.
New Jersey Municipal or county Board of Health (most contract the work to a local health department); NJDEP itself approves only where local authorities cannot approve a project under N.J.A.C. 7:9A Local New Jersey Department of Environmental Protection (NJDEP)
Apply to your municipal or county Board of Health, not NJDEP directly — NJDEP writes the statewide rule but almost never issues the permit itself.
New Mexico New Mexico Environment Department (NMED) Liquid Waste Program, via the applicant's local NMED field office State New Mexico Environment Department (NMED)
Statewide direct-state permitting — no county layer; submit your application to your local NMED field office.
New York County (local) health department where the property is located not stated on source Local New York State Department of Health (NYSDOH)
NYSDOH sets the statewide minimum design standard (Appendix 75-A); the permit itself is issued and enforced by your county health department, not the state.
North Carolina County (local) health department, Environmental Health division — issues the Improvement Permit / Authorization to Construct Local NC Department of Health and Human Services (DHHS), Division of Public Health, On-Site Water Protection Branch
NC DHHS sets the statewide rule (15A NCAC 18E); your county (local) health department's Environmental Health office issues the actual permit.
North Dakota Local public health unit issues the installation permit (and sets local codes); ND DEQ separately licenses the installer It varies North Dakota Department of Environmental Quality (NDDEQ), Division of Water Quality
This is genuinely split: your LOCAL public health unit issues the permit and sets local septic codes, while DEQ licenses the installer statewide — no single statewide design rule is finalized yet.
Ohio Your local city or general health district Local Ohio Department of Health / Bureau of Environmental Health
About 120 local health districts each issue permits and set their own fees; ODH receives none of it.
Oklahoma Oklahoma DEQ directly — a regional DEQ Environmental Specialist assigned by property location reviews and issues the Authorization to Construct (ATC) State Oklahoma Department of Environmental Quality (DEQ), Environmental Complaints & Local Services Division, On-Site Sewage Programs
DEQ itself issues the Authorization to Construct — there is no county health department in this process in Oklahoma.
Oregon Oregon DEQ, or your county where DEQ has delegated the programme by agreement It varies Oregon Department of Environmental Quality
DEQ permits directly in Curry, Jackson and Josephine counties from its Medford office; in the other 33 counties it contracts with a local agent, who sets its own fee with a DEQ surcharge on top. Ask DEQ which applies to your parcel.
Pennsylvania A 'local agency' — a municipality, a joint municipal agency, or in some places a county health department — acting through its certified Sewage Enforcement Officer (SEO) It varies Pennsylvania Department of Environmental Protection (DEP), Bureau of Clean Water — Act 537 Sewage Facilities Program
No single, uniform local authority — PA delegates permitting to whichever local agency (municipality/joint agency/sometimes county health dept) exists in that area, each via its own certified SEO.
Rhode Island Rhode Island Dept. of Environmental Management (DEM), Office of Water Resources — DEM reviews and stamps the application 'Approved' as the permit to install State Rhode Island Department of Environmental Management (DEM), Office of Water Resources
RI has no local health-department layer for septic — DEM itself reviews the design and issues the construction permit statewide.
South Carolina Your local SCDES office (a state agency office, not county government) State South Carolina Department of Environmental Services (SCDES) — the environmental function formerly housed in DHEC
SCDES's own regional 'local offices' (a STATE agency, not county government) license installers and administer septic permitting statewide under Regulation 61-56.
South Dakota County planning & zoning department (issues the local 'Individual Sewage Disposal Permit') Local South Dakota Department of Agriculture and Natural Resources (DANR)
DANR sets the statewide design rule (ARSD 74:53:01), but it is your COUNTY planning/zoning department that actually issues the local sewage-disposal permit.
Tennessee TDEC Division of Water Resources Environmental Field Office in most of the state — but in nine contract counties, your county or metro health department It varies Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources
TDEC issues the Subsurface Sewage Disposal System construction permit statewide through its Environmental Field Offices, except in the nine contract counties it names — Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby and Williamson — which run their own permitting. That includes Memphis, Nashville, Knoxville and Chattanooga, so most urban Tennesseans apply locally, not to the state.
Texas TCEQ, unless your county is a TCEQ-approved authorised agent — then the county It varies Texas Commission on Environmental Quality
Most populated Texas counties are authorised agents and issue their own permits; check yours before applying to TCEQ.
Utah Local health department (delegated jurisdiction under state rule) in most counties; Division of Water Quality directly where no local program is delegated, and for larger systems not stated on source It varies Utah Department of Environmental Quality (DEQ), Division of Water Quality
Rule R317-4 lets DWQ delegate or rescind a local health department's authority, so which office issues your permit is not uniform statewide.
Vermont DEC Wastewater System & Potable Water Supply Program — one of five state regional offices (no county role) State Vermont Agency of Natural Resources, Department of Environmental Conservation (DEC)
Vermont took universal statewide jurisdiction over wastewater permitting in 2007; homeowners apply straight to a DEC regional office, never a town or county.
Virginia Local Virginia Department of Health district office (a state health district office, not county government) State Virginia Department of Health (VDH), Division of Onsite Water and Wastewater Services
VDH is organized into 35 local health districts, so the permit desk is local, but the issuing authority is a state agency, not county government.
Washington County or multi-county Local Health Jurisdiction (LHJ) Local Washington State Department of Health (DOH), Wastewater Management Program
DOH writes the statewide rule but 35 Local Health Jurisdictions permit systems up to 3,499 gpd; DOH's own LOSS program only takes over above that flow.
West Virginia Your local (county) health department — it takes the application and the fee and issues the permit Local West Virginia Department of Health, Bureau for Public Health, Office of Environmental Health Services (OEHS)
Under the state sewage rule (64 CSR 9) the permit is legally the Director of Health's, issued through local health departments acting as designees — so you apply locally, not to Charleston. The state's own application form SS-182A carries a 'For Health Department Use — Permit Issued By' block, and the local health department administers the perc test.
Wisconsin County zoning/sanitary department acting as a DSPS-certified 'agent county'; DSPS directly for non-agent counties and state-owned POWTS It varies Wisconsin Department of Safety and Professional Services (DSPS), Division of Industry Services
Not every county is a certified 'agent'; where a county isn't certified, or for state-owned systems, DSPS itself issues the permit under SPS 383.21.
Wyoming Wyoming DEQ in Carbon, Niobrara, Platte and Weston counties (and Campbell for commercial); delegated local authorities elsewhere It varies Wyoming Department of Environmental Quality, Water Quality Division
DEQ issues directly in a handful of named counties only; everywhere else a delegated local authority holds the permit.

What this page checked, and what it doesn't cover

Every row above was written from the linked government page and then re-read against that page by separate reviewers asking one question: does this page actually say this? It found real errors — a citation can resolve, sit on the right .gov domain, and still describe a different programme entirely. Two whole columns we had researched, the governing rule citation and installer-licensing rules, failed that check often enough that they are not on this page at all. What survived is the one question this page answers: who issues the permit. Rows that still could not be sourced are labelled below rather than quietly kept.

6 of the 51 rows carry a caveat, and they are two different caveats. 4 states — Alaska, Arizona, Arkansas, Massachusetts — block automated access to their own websites from every route available to us, so we could not read their citation ourselves; those are marked source unreachable. On 2 more — New York, Utah — we could read the state's page and it simply does not say who issues the permit; those are marked not stated on source and the row is our research read rather than a quote. Both are starting points. Confirm with the linked agency before you file.

No permit fees. We deliberately publish no fee figures. Septic permit fees are set by the county or town, not the state — two counties in one state routinely differ more than two states do. When we audited eight states for a state-published fee schedule, exactly one — Florida, under s. 381.0066 F.S. — had one; the rest set fees locally or do not publish them at state level. A national "septic permit cost by state" table would be mostly invention. Ask the office in your row what it charges; it is normally the smallest line in the job. Our septic cost calculator estimates the installation itself.

Not the whole rulebook. Septic system regulations also cover tank sizing, setbacks, soil and perc testing, inspection at sale, and installer licensing, and those genuinely vary by county even where the state issues the permit. This page answers one question — who issues it — and that is the one that decides where your application goes.

How to apply for a septic permit

  1. Find your row above and note whether the permit is issued locally, by the state, or varies.
  2. If it is local, search for your county's health department or environmental health division — that office holds the application, the fee schedule and the inspection calendar.
  3. If it varies, ask the state programme in the last column which office covers your parcel before you file anything. Filing with the wrong one is the common and avoidable delay.
  4. Book the soil or perc test early. Nearly every jurisdiction requires it before it will issue a construction permit, and in much of the country it can only be done in certain months.
  5. Get the permit before the installer digs. An unpermitted system is a real problem at resale, and several states require an as-built inspection before the trench is covered.

Estimate my septic installation cost → Read the buying guide

Last checked 2026-09-01. Permitting authority moves when a state delegates or rescinds a local programme. If a row here is out of date, the linked government page is the authority, not us — how we work.